Completing construction of Clearwater Elementary and Willow Lake Elementary Schools was part of the Metropolitan School District of Washington Township in Indianapolis 2016 Referendum. Both of these new elementary schools followed the same construction schedule and opened in the fall of 2019. Each school contains approximately 95,000 square feet and was designed to address the district’s growing student population. Classrooms, collaboration areas, media centers, and outdoor spaces were carefully designed to enhance accessibility and functionality while fostering an environment conducive to 21st-century education. CSO is the architect of these two new facilities with Design 27 included as a member of the design team to provide technology systems design. Design 27 has proudly worked with MSD of Washington Township for the past 20 years!